當前位置:生活全書館 >

學習教育

> 測量專業與英文自我評價

測量專業與英文自我評價

測量專業與英文自我評價如何寫呢?我們一起來看一看:

測量專業與英文自我評價可以分三部分來寫。首先是開頭部分,可以寫自己的基本情況,接著可以寫自己的學習內容,最後結尾部分寫對自己的評價。

測量專業與英文自我評價篇一

Two weeks of measurement practice, I got a more comprehensive, systematic exercise, but also learned a lot of books can not learn the knowledge and skills.

I remember the first week of internship, we are very excited, a week down we feel very relaxed, rest for two days, began measuring practice, I followed the teacher to find the control point, then everyone is still excited, that the next Of the week should also be very easy, it is not. Although a bit lucky, but we all learn a lot, only a lot of ordinary "a lot of shopping" to learn things. I like to think, like the summary, so I summed up the following points:

Grow up, to try to take some responsibility. We are born with a kind of inertia, whether individuals, or a team, if it is in an inert atmosphere, that she (people) efficiency will not be high, but if everyone has a strong sense of responsibility, Take some responsibility, then the efficiency is not only improved, and the task will be completed very well.

Infectivity is very important. In a team, in order to have a good atmosphere, the first person to put forward the idea of thinking is very important, because later people can not help but have a herd mentality. If he (she) the idea is positive, then someone will actively think of some problems. On the contrary, the whole team into a negative atmosphere. Therefore, each of us should actively think about the problem.

Think a lot. What is the internship, internship is the theoretical knowledge into their own knowledge of the process. Internship process only a lot of thinking, in order to digest a lot of knowledge, but also extends a lot of previously unknown. Teamwork, through thick and thin. This is a cliché, but in this practice have to mention, because it is everywhere, remember very clearly that many times we are on the measurement site for lunch; is that we all get up early, and then in the cold Whiz in the operation, everyone in the trembling; we are carrying the instrument touched the black home. All this bitter and happy, we all bear together. Through thick and thin, we are happy! Learn to compromise. Compromise is the highest art, in the process of cooperation, inevitably there will be some conflicts, then we need to calm down to think about the solution to the problem, everyone has done some concessions, then things are easy to solve.

測量專業與英文自我評價

測量專業與英文自我評價篇二

1, political and ideological aspects

Adhere to the study of Marxism-Leninism, Mao Zedong (reproduced in: measuring professional work self-identification) East thought, practice "Three Represents", establish a scientific concept of development. Always strict demands on themselves, based on their own, assiduously business technology, and strive to do a good job. Listen to a variety of superior field, throughout the county to carry out measurement work, regardless of the working environment, can be consistent, perseverance to do their own work. Work hard, active, practical style, diligent in thinking, efficiency, and always maintain a strong sense of dedication and dedication, and actively contribute to the development of measurement work ideas, dedicated their meager strength.

Second, professional and technical work

Since I joined the work, I have worked hard to learn engineering knowledge and improve my job skills in order to meet the needs of my work. Through my own efforts and with the help of my colleagues and leaders, I have been able to work effectively and efficiently. Since taking office, I actively undertake the work of engineering surveying tasks, can be done conscientiously, the successful completion of the tasks assigned by the organization, never for their own private affairs affect the normal work, and actively participate in the organization of the activities. The following are the major tasks that have been completed since my appointment:

1, according to the county party committee and government requirements to complete the county key town topographic map measurement and county control planning topographic mapping measurement; 2, since 2006 to complete the county 21 townships new community, farmer settlement survey work;

3, the synergy to complete the county key projects and investment projects related to measurement work;

4, completed the industrial park and the backup industrial park topography measurement 18 square kilometers;

5, the completion of the municipal government issued a special standardization of the topographic maps, map measurement work;

6, to complete the county key road *** Avenue, *** Avenue, *** Road, *** Avenue vertical and horizontal cross-section measurement, strip chart measurement;

7, coordinated the completion of the county control network encryption and cors station construction;

8, to complete the footwear industrial park, Sands commercial center, building materials market and other urban and rural integration projects to promote the work of measurement. In order to better adapt to the measurement work, and strive to do their own work at the same time. I attach great importance to continuing education and learning, and actively participate in various departments of the organization of laws, regulations and professional and technical training.

Third, the existing problems

Measurement and management related to the ability and level to be improved, not enough innovation. In future work, I will be more hard to learn, use the knowledge to strive to enhance the level of operational capacity, and constantly improve the working methods, improve the work.

For efficiency, down-to-earth, hard working, hard work, to become an excellent measurement of professional and technical personnel.
以上就是小編今天的分享,希望可以幫助到大家。

  • 文章版權屬於文章作者所有,轉載請註明 https://shqsg.com/xuexijiaoyu/k1905y.html